Bogen CM-810 Instrucciones de operaciones Pagina 61

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 78
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 60
Scheduled Maintenance
GMS810-/GMS811-FIDOR · Operating Instructions · 8013911 V1-0 · © SICK AG 61
Subject to change without notice
7.3.3 Replacing the sample gas filter
7.3.3.1 Remove the sample gas filter
1 Unscrew 2 screws of the insulating cover.
2 Remove insulating cover and protection against bends.
3 Unscrew 4 screws of the sample gas inlet block.
4 Remove sample gas inlet block.
5 Remove O-ring and filter from sample gas inlet block.
7.3.3.2 Install the sample gas filter
1 Place filter into sample gas inlet block.
2 Place a new O-ring into sample gas inlet block.
3 Screw sample gas inlet block (1) tight in the desired direction with 4 screws.
Fig. 7 Protection against bends and insulating cover
4 Screw protection against bends (2) tight with 2 screws.
1 Screw insulating cover (3) tight with 2 screws.
Fig. 8 Installed sample gas inlet
NOTICE:
Perform work on the sample gas filter only when it is cold.
3
1
2
Vista de pagina 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 ... 77 78

Comentarios a estos manuales

Sin comentarios